| sunny |
| |
 |
| 19ºC |
GENERAL REPORT: mechanical duct work install continuing, dry wall install continuing also surgical light ceiling bracket install
Completed by: Ron Stevenson
ELECTRICAL REPORT: pot lights being roughed in, also electrical wiring rough in and more electrical boxes being installed
Completed by: Ron Stevenson
MECHANICAL REPORT: med gas shut down /tie in, also mechanical duct work install
Completed by: Ron Stevenson
|
|
|
|
|
| electrical wiring installation |
Electrical box rough-in |
pressure test sprinkler line |
drywall and steel stud installation |
|
|
|
| Pot light rough-in |
surgical light ceiling bracket |
|