Return to Site

Daily Activity on Job Site - Thu September 2, 2010

sunny
 
19ºC

GENERAL REPORT: mechanical duct work install continuing, dry wall install continuing also surgical light ceiling bracket install
Completed by: Ron Stevenson
ELECTRICAL REPORT: pot lights being roughed in, also electrical wiring rough in and more electrical boxes being installed
Completed by: Ron Stevenson
MECHANICAL REPORT: med gas shut down /tie in, also mechanical duct work install
Completed by: Ron Stevenson



electrical wiring installation Electrical box rough-in pressure test sprinkler line drywall and steel stud installation
Pot light rough-in surgical light ceiling bracket