Peace Arch Hospital
Maternity RenovationDaily Activity on Job Site - Thu September 2, 2010
![]() |
| sunny |
![]() |
| 19ºC |
GENERAL REPORT: mechanical duct work install continuing, dry wall install continuing also surgical light ceiling bracket install
Completed by: Ron Stevenson
ELECTRICAL REPORT: pot lights being roughed in, also electrical wiring rough in and more electrical boxes being installed
Completed by: Ron Stevenson
MECHANICAL REPORT: med gas shut down /tie in, also mechanical duct work install
Completed by: Ron Stevenson
| electrical wiring installation | Electrical box rough-in | pressure test sprinkler line | drywall and steel stud installation |
| Pot light rough-in | surgical light ceiling bracket |