| sunny |
| |
 |
| 18ºC |
GENERAL REPORT: mechanical duct work install, steel stud framing continuing
Completed by: Ron Stevenson
ELECTRICAL REPORT: wires being pulled in plus electrical boxes being installed
Completed by: Ron Stevenson
MECHANICAL REPORT: pressure testing sprinkler lines, med gas lines install continuing
Completed by: Ron Stevenson
|
|
|
| Pressure testing new sprinkler lines |
dry wall and sanitary drain line install |
|