GENERAL REPORT: floor laying continuing, patient toilets being installed, millwork install continuing
ELECTRICAL REPORT: nurse call install continuing
MECHANICAL REPORT: Fire alarm verification, GE on site. Sprinkler shutdown, sprinkler head relocation and domestic hot and cold water main tie ins to the 3rd fl mechanical room.