| sunny |
| |
 |
| 17ºC |
GENERAL REPORT: steel stud install continuing, also some demo work continuing.
Completed by: Ron Stevenson
ELECTRICAL REPORT: istalling of conduit and electrical boxes
Completed by: Ron Stevenson
MECHANICAL REPORT: sanitary line shut down to install new drain lines, also sprinkler shut down to install new lines
Completed by: Ron Stevenson
|
|
|
|
|
| PH2 Demo |
ph2 steel studs |
electrical boxes |
new sanitary line install |
|
|
|
| new mech ductwork install |
steel studs |
|