GENERAL REPORT: steel stud install continuing, also some demo work continuing.
Completed by: Ron Stevenson
ELECTRICAL REPORT: istalling of conduit and electrical boxes
Completed by: Ron Stevenson
MECHANICAL REPORT: sanitary line shut down to install new drain lines, also sprinkler shut down to install new lines
Completed by: Ron Stevenson
| PH2 Demo | ph2 steel studs | electrical boxes | new sanitary line install |
| new mech ductwork install | steel studs |